Adam at the Verizon Wireless Arena in Manchester NH discussing Rigging Points with facility
staff for the NH Food Bank´s International Fantasy Hair Competition. MFI used over 250 feet of
Applied Electronics 12" box truss and over 20 Pick Points for this production.

This is the a shot from Front of House of the Final Stage Product after a late night of setup
for the crew of 12. MFI used three LCD projectors for this show; Two 9,000 Lumen Sanyo XF-70s &
One 15,000 Lumen Sanyo XF-47!
The Elliot wanted to show their new logo, PowerPoint slides, and a live video feed of the Main
Stage on all five floors of their new facility. The event was a logistical nightmare for
cable runs and Sound, Lighting, & Video distribution, especially considering the number of
guests and vast event layout. MFI was able to accomplish this while having zero trip hazards
and without leaving a mark on new Outpatient Facility.
|
MFI Productions in action!
These images are just for fun and to give you an idea of what has gone into some of our past
productions.
Rick adjusting the 16 box Nexo Geo-S12 Line Array system for the Hair Competition at the Verizon
Wireless Arena. The VWA is the largest New England Concert/Sports
Venue North of Boston at over 10,000
seats for an End Stage Concert setup.
The Elliot Hospital asked us to handle all production needs for the Grand Opening of their new
Facility off Queen City Ave in Manchester NH. MFI utilized 24 Chauvet ColoradoTour1 LED Units,
Eight 10´ Sections of 12" Box Truss on 36" Flat Floor Plates, Combined with YJAM’s Yellow Jackets
allowed for Decorative Exterior Lighting without creating any trip hazards for the guests or
the Valets.

The 2009 First Lego League New Hampshire State Championship Tournament was held in Bedford
NH at the new High/Middle School. This was a new and untested facility for an event of this
size. MFI worked with BAE & First Lego League representatives to make sure the facility would
completely meet their needs. This included working with the design firms structural engineer
to confirm Work Load Limits and Snow Loads for the new ceiling. Six ˝½ Ton Chain Motors, Two
Applied Electronics LT-16 Crank Lighting Towers, and 120´ of Truss were used for this setup.
|